Try GOLD - Free

Marcos vows to fix flood control problems

Manila Bulletin

|

August 25, 2025

DPWH braces for sweeping internal 'cleansing' over ghost projects

- ARGYLL CYRUS GEDUCOS and TRIXEE ROSEL

Marcos vows to fix flood control problems

President Marcos declared that he would not leave office until after the country's flood control problems have been resolved even as he called out corruption and poor workmanship in government projects.

"If there's one thing, I will not leave this office until I fix this. This is one of those things," Marcos said during an inspection of the Kennon Road rockshed project at Camp 6.

Barangay Camp 4, Tuba, Benguet, on Sunday, Aug. 24.

The President, joined by Baguio City Mayor Benjamin Magalong and Tuba Mayor Clarita Sal-ongan, personally checked the 152-meter structure meant to protect motorists from landslides. He pointed out major defects, including collapsed slope protection and erosion under the road.

"You can see for yourself na talagang hindi tinrabaho nang mabuti ito (you can see for yourself that this was not properly done)," he said, adding that the project's supposed safeguards "collapsed immediately." Marcos noted that the P260 million spent on the project had "no effect whatsoever" in protecting the area.

"Parang walang ginawa (It's as if nothing was done)," he said.

"Wala silang itinayo, wala silang nilagay na wall, wala silang nilagay na riprap, wala silang nilagay na slope protection (They did not build anything, they did not put up a wall, they did not put a riprap, they did not put slope protection)," he added.

According to the President, fixing the infrastructure would cost the government more.

"To correct this will cost double that. That's my top-of-the-head estimate. P500 million ito para ayusin (to fix this)," he said.

"So, how can you tell me that it's not economic sabotage? Kinuha mo yung P260 million, wala kaming nakitang effect dun sa kanyang ginawa na kontrata (You took P260 million, but we didn't see the effect of that contract)," he added.

MORE STORIES FROM Manila Bulletin

Manila Bulletin

Ramadhan: A time for reflection and community

Assalamu alaikum wa Rahmatullahi wa Barakatuh.

time to read

3 mins

February 18, 2026

Manila Bulletin

Move with purposeful haste, Marcos urges

President Marcos has urged Filipinos to \"move with purposeful haste,\" matching the Fire Horse's symbolism of courage and forward motion with discipline, hard work, and sound governance.

time to read

1 mins

February 18, 2026

Manila Bulletin

Manila Bulletin

Malaysia and Japan plan major cross-border carbon capture project, despite climate benefit doubts

Japan wants to ship carbon emissions to Malaysia in a first-of-its-kind project in Southeast Asia for carbon capture and storage, a widely debated process that critics say is more symbolic than effective in curbing climate change.

time to read

3 mins

February 18, 2026

Manila Bulletin

Illicit funds tied to exploitation

More than half of suspicious money flowing into the Philippines from 2021 to the first half of 2024 was linked to child exploitation, with the United States (US) emerging as the primary source of these illicit funds, according to the Anti-Money Laundering Council (AMLC).

time to read

2 mins

February 18, 2026

Manila Bulletin

A grateful heart is a healthy heart

How to keep your heart healthy beyond diet and exercise

time to read

2 mins

February 18, 2026

Manila Bulletin

Manila Bulletin

Mayor Isko calls for closer PH-China cooperation

Manila Mayor Francisco “Isko Moreno“ Domagoso called for stronger Manila-Beijing connectivity when he led the countdown to the Chinese New Year in Binondo on Monday night, Feb. 16.

time to read

3 mins

February 18, 2026

Manila Bulletin

Bulacan seems to be the epicenter of ghost flood control projects - Ombudsman

“The way things are unravelling and unfolding, it seems that Bulacan is really the epicenter of ghost projects.”

time to read

2 mins

February 18, 2026

Manila Bulletin

Trimester system still a proposal - DepEd

Consultations with stakeholders ongoing

time to read

1 mins

February 18, 2026

Manila Bulletin

Flood-control loans face restructuring

The Philippine government is set to cancel part of its loans from the World Bank and the Asian Infrastructure Investment Bank (AIIB) for the long-delayed Metro Manila flood control project and overhaul its implementation plan, as slow disbursement and construction setbacks raise doubts about completing critical infrastructure on time.

time to read

3 mins

February 18, 2026

Manila Bulletin

What is a rheumatological disease?

The immune system remains overstimulated and does not calm down even after the infection is resolved.

time to read

1 min

February 18, 2026

Listen

Translate

Share

-
+

Change font size