Try GOLD - Free
LPG Policy Must Be Long-Term, Safe, and Inclusive
Energy & Power
|EP_23_09 (Energy & Power Vol 23 Issue 9 October 16, 2025 Anniversary Issue)
Price control is another major issue. In neighboring India, subsidies ensure that LPG is affordable for ordinary households. Bangladesh, by contrast, imposes taxes and VAT, making LPG more expensive while leaving private operators to subsidize consumers from their own pockets. This imbalance is unsustainable.
Energy security is often described as the lifeblood of a nation. Without a stable supply of fuel, no society can secure education, healthcare, food, or housing. For Bangladesh, as for many other countries, energy is inseparable from national security. The question before us today is not whether LPG matters, but whether we are prepared to manage it wisely and sustainably.
LPG's Proven Role in Global Energy Security
Around the world, diverse fuels—coal, liquid fuel, solar, wind, hydrogen, and battery-backed power—have been explored. Yet none have fully guaranteed energy security in the way LPG has. Over the last 50 to 70 years, LPG has consistently provided stability, especially across South and Southeast Asia. In India, Pakistan, Sri Lanka, Malaysia, Singapore, and Thailand, LPG is now widely accepted as a household and industrial fuel.
In Bangladesh, LPG consumption has grown rapidly, now reaching about 1.3-1.5 million tonnes annually, with the potential to expand to 3 million tonnes in the near future. This growth is not a luxury—it is a necessity. The government cannot indefinitely rely on subsidized natural gas and LNG, which still demand heavy subsidies even when sold at a mixed price. If even a fraction of these subsidies were redirected to LPG, rural and western regions—areas excluded from pipeline gas—would experience far stronger energy security.
The Missing Piece: A Long-Term Policy
While Bangladesh has a basic LPG policy, it lacks a comprehensive long-term roadmap. Energy security cannot be left to short-term improvisation. Such a strategy must cover the entire supply chain: import facilities, bottling, distribution, retail, and consumer usage. It must set enforceable safety standards and create an investment-friendly framework aligned with international practices.
This story is from the EP_23_09 (Energy & Power Vol 23 Issue 9 October 16, 2025 Anniversary Issue) edition of Energy & Power.
Subscribe to Magzter GOLD to access thousands of curated premium stories, and 10,000+ magazines and newspapers.
Already a subscriber? Sign In
MORE STORIES FROM Energy & Power
Energy & Power
Govt Agencies Must Lead Transition to Renewable Energy: Rizwana
Environment, Forest and Climate Change Adviser Syeda Rizwana Hasan has said that all government agencies must transition to renewable energy within the next two to three years to set an example for the nation.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Carbon Markets Key to Bangladesh's Green Growth: Experts
Experts highlighted the potential of carbon markets to boost climate investments and promote sustainable growth in Bangladesh.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Vietnam, Singapore Step Up Cooperation on Energy, Trade, Technology
Vietnamese Minister of Industry and Trade Nguyễn Hồng Dikn and Singaporean Minister-in-Charge of Energy, and Science and Technology in the Ministry of Trade and Industry Tan See Leng have agreed to continue close coordination in implementing key areas of cooperation, particularly in energy, industry, trade, and science and technology.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Tk 1,200cr Lost in Missed Savings as Pipeline Sits Idle
Bangladesh has lost around Tk 1,200 crore in missed savings over the last one and a half years due to the delay in commercial launch of a dual pipeline that can carry imported oil directly from Cox's Bazar's Maheshkhali to Patenga in the port city.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
BD Seeks Korean Investments in Textiles, Electronics, Renewables
The Bangladesh Investment Development Authority (BIDA) has urged Korean investors to leverage Bangladesh's dynamic investment landscape, highlighting the country's strategic advantages and ongoing pro-business reforms aimed at facilitating foreign (FDI).
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
India Issues 3.6 GW of New RE Tenders
India has issued 3,600 megawatts (MW) of renewable energy tenders in September under the project development category.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Shipping Corporation Wants to Operate Pipeline
State-owned Bangladesh Shipping Corporation sent a proposal to the energy ministry through the shipping ministry on June 19, expressing its interest in operating the pipeline with assistance from a third party.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Climate Tipping Points Being Crossed, Scientists Warn
Global warming is crossing dangerous thresholds sooner than expected, with the world’s coral reefs now in an almost irreversible die-off, marking what scientists recently described as the first “tipping point” in climate-driven ecosystem collapse.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Energy Adviser Blames Section of Politicians, Businessmen for Crisis in Gas Sector
Adviser of the Ministry of Power, Energy and Mineral Resources Muhammad Fouzul Kabir Khan recently said a section of politicians and their allied businessmen have created the ongoing crisis in the gas sector.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Frequent Power Outages Leave Sunamganj Residents in Despair
Daily life in 12 upazilas of Sunamganj has been thrown into disarray as residents endure up to 18 hours of load-shedding each day due to an acute power shortage.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Listen
Translate
Change font size
