The Perfect Holiday Gift Gift Now

Cancelation Of Solar Project LOIs Erodes Investors' Confidence

Energy & Power

|

EP_22_17 (Energy & Power Vol 22 Issue 17 Feb 16, 2025)

The renewable energy capacity of Bangladesh can be developed up to 5,000MW by 2030, subject to policy support for investing in rooftop and irrigation solar systems alongside utility-scale ones.

Cancelation Of Solar Project LOIs Erodes Investors' Confidence

To promote rooftops, the Sustainable and Renewable Energy Development Authority (SREDA) should formulate a bankable tripartite business model to attract private investment, while a guideline would be required for the installation of solar systems on the rooftops of government buildings. A business model for solar irrigation is also essential. Formulation of the models and guidelines would take only 1-2 months if the RE-friendly Energy Advisor launches an initiative, setting the stage for rapid expansion of solar energy through attracting private investment.

Mostafa Al Mahmud, President of the Bangladesh Sustainable and Renewable Energy Association (BSREA) and Chairman of Greentech Solution Limited, said this in an exclusive interview with Energy & Power Editor Mollah Amzad Hossain.

The government has released the draft RE policy 2025 in the public domain, seeking opinions from interested individuals or organizations. What are your observations? Have you already given your opinion?

BSREA has formed a committee to review the draft policy and suggest amendments and recommendations. The draft policy did not clarify many important matters. Some important areas like EV and energy storage require addressing in detail. We are going to recommend further clarifications on these issues. The draft policy did not provide directions for developing SREDA as a competent organization with skilled professionals. We are going to make specific recommendations for this.

The draft policy has recommended the exemption of tax and VAT on equipment and materials used for the generation of renewable energy. Do you consider these enough to remove the tariff barriers?

MORE STORIES FROM Energy & Power

Energy & Power

Energy & Power

Belém's Hard Lesson

COP30 in Belem delivered mixed outcomes amid rising geopolitical tensions and record climate impacts.

time to read

7 mins

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

IDCOL Wins Asian Power Awards 2025

Infrastructure Development Company Limited (IDCOL) has been named \"Solar Power Project of the Year - Bangladesh\" winner at the Asian Power Awards 2025, which celebrated regional energy leaders at an awards dinner held on 23 October 2025 in Kuala Lumpur, Malaysia.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

DoE Shuts Illegal Brick Kilns, Fines TK 18 Lakh in Savar

The Department of Environment (DOE) recently a special conducted enforcement drive in Savar Upazila to curb air pollution and implement the degraded air shed declaration, shutting down several illegal brick kilns and realizing fines amounting to TK 18 lakh.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

Bangladesh Seeks Climate Justice at COP30

Bangladesh has emphasized justice, ambition and urgent global solidarity in the face of escalating climate impacts at COP30 in Brazil's Belйm.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

EU Moves to Bar 'Green' Labels for Fossil Fuel Investments

The European Commission said recently it wants to exclude companies involved in fossil fuels from financial products marketed as \"sustainable\" in the EU, a step long demanded by environmental groups and experts.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

IDCOL Requests Tk10b Support for Installation of 300 MW Green Power

Infrastructure Development Company Limited (IDCOL) has now turned its focus on promoting rooftop solar systems for both industries and public infrastructures.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

Loan-Heavy Climate Finance is Pushing Frontline Nations Toward a Debt Trap: New Analysis

Change Initiative recently disseminated the Climate Debt Risk Index 2025 (CDRI'25) jointly with Young Power in Social Action (YPSA), finding that loan-dominant climate finance, slow cash delivery, and high exposure to climate shocks are combining to raise debt risks across dozens of low-income and climate-vulnerable countries.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

ACC Raids Two Ctg BPDB Offices

The Anti-Corruption Commission has conducted raids on two offices of the Bangladesh Power Development Board in Chattogram region over allegations of irregularities.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

Third Cohort of Shoktikonna Graduates Held

The Shoktikonna Third Cohort Graduation Ceremony, held on 24 November 2025, celebrated a new generation of young women leaders committed to advancing Bangladesh's sustainable and inclusive energy future.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

DESCO Back in Profit in Q1 on Increased Distribution Margin

Company Dhaka Electric Supply (DESCO) secured a profit of Tk 583 million in the first quarter through September this year, marking a strong turnaround from a loss of Tk 322 million in the same quarter last year.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Listen

Translate

Share

-
+

Change font size