HOW LONG DOES PLANNING PERMISSION LAST?

Homebuilding & Renovating

|

May 2025

To ensure permission is in place prior to starting your build project, how long is it before you have to begin work? Make sure you know the rules to ensure you’re in line with the latest regulations

HOW LONG DOES PLANNING PERMISSION LAST?

Planning permission is a cornerstone of any development project, from the smallest home extension to a brand-new self-build dream dwelling. It’s a process that can often seem complex and daunting, filled with jargon and regulations.

One of the frequent questions I encounter as a planning consultant is, "How long does planning permission last?" This seemingly simple question unlocks a wealth of information about time limits, conditions and the intricate workings of the planning system. Understanding these nuances is absolutely essential for anyone embarking on a development project, as missteps can lead to costly delays, frustrating reapplications and even the complete derailment of your plans. In this article I'll delve into the intricacies of planning permission duration, explore the circumstances under which it expires and outline the various strategies available to manage the process effectively, ensuring your project stays on track.

imagePLANNING DURATION

The lifespan of planning permission isn't a one-size-fits-all concept. In England, Scotland and Wales, the standard duration for full planning permission is three years from the date of approval. This means that physical development, the actual construction work, must commence within this three-year window. Northern Ireland operates on a slightly different timeframe, typically allowing five years for development to begin. However, these are just the general rules. The reality is often more complex, particularly when dealing with outline planning permission.

DIFFERENT PLANNING PERMISSION ROUTES

WEITERE GESCHICHTEN VON Homebuilding & Renovating

Homebuilding & Renovating

Homebuilding & Renovating

Ahead of the curve

London-based architecture and ideas studio, CAN, extended this home to make it suitable for the needs of a growing family, placing an emphasis on natural materials and a unique approach to design. The resulting renovation turned the once-disconnected ground floor of this east London terrace into an open-plan kitchen and dining area spilling into the garden through a bespoke curved window and oversized glazed door.

time to read

1 min

December 2025

Homebuilding & Renovating

Self-build for beginners

BUILDING WITH INSULATED CONCRETE FORMWORK

time to read

7 mins

December 2025

Homebuilding & Renovating

Homebuilding & Renovating

CAN PLANNING PERMISSION BE WITHDRAWN?

If you're concerned about whether you can have your permission revoked for your project, our planning expert offers advice on what can and can't be done

time to read

6 mins

December 2025

Homebuilding & Renovating

Homebuilding & Renovating

A taste of Manhattan

Perched at the top of their listed Victorian terrace, Harry and Joe's new loft was inspired by iconic New York architecture

time to read

4 mins

December 2025

Homebuilding & Renovating

Homebuilding & Renovating

Revolutionary retrofits

Discover the measures taken to radically improve the thermal performance of these existing homes

time to read

4 mins

December 2025

Homebuilding & Renovating

Homebuilding & Renovating

6 TIPS FOR BUILDING AN EXTENSION THROUGH WINTER

Creating your dream project during the coldest months isn't for the faint-hearted. Follow these six essential tips to help survive bad weather and to mitigate delays

time to read

5 mins

December 2025

Homebuilding & Renovating

Homebuilding & Renovating

GUIDE TO RENOVATING

A whole house rewire is commonly needed in renovation projects - here's everything you need to know about the job and the costs

time to read

7 mins

December 2025

Homebuilding & Renovating

Homebuilding & Renovating

14 tips for designing a bathroom

Before you embark on a new bathroom, give careful thought to every aspect. Our expert guide offers top-to-bottom advice...

time to read

8 mins

December 2025

Homebuilding & Renovating

Homebuilding & Renovating

Back to its best

Linda Danvin embarked on a year-long task to turn a forgotten Cornish townhouse into a historic gem

time to read

3 mins

December 2025

Homebuilding & Renovating

Homebuilding & Renovating

Stone love

Bringing a dilapidated barn back to life using sympathetic materials proved a winning move for

time to read

4 mins

December 2025

Listen

Translate

Share

-
+

Change font size

Holiday offer front
Holiday offer back