Magzter GOLD ile Sınırsız Olun

Magzter GOLD ile Sınırsız Olun

Sadece 9.000'den fazla dergi, gazete ve Premium hikayeye sınırsız erişim elde edin

$149.99
 
$74.99/Yıl
The Perfect Holiday Gift Gift Now

Lok Sabha passes Oilfield amendment bill 2024

EPR Magazine (Electrical & Power Review)

|

April 2025

The Bill will play a key role in India's quest for ensuring energy availability, accessibility, affordability and security for the citizens and fulfilling the Prime Minister's vision of Viksit Bharat by 2047.

Lok Sabha passes Oilfield amendment bill 2024

Lok Sabha passed the Oilfield (Regulatory and Development) Amendment Bill, 2024. The Bill was earlier passed by the Rajya Sabha on 3rd December, 2024. The Bill intends to reform the legal framework to meet the current needs and market conditions and to make the sector more attractive to investors so that exploration and production of oil and gas could be increased further. The Bill will play a key role in India's quest for ensuring energy availability, accessibility, affordability and security for the citizens and fulfilling the Prime Minister's vision of Viksit Bharat by 2047.

Over the last decade, the Government has brought several path breaking reforms including a landmark shift from ‘production sharing’ regime to ‘revenue sharing’ regime for awarding contracts, simplified processes and reduced regulatory burden to promote exploration and production of oil and gas in India, release of previously No Go areas for new exploration, deregulation of crude as well as marketing and pricing freedom for natural gas. A crucial outcome of these major reforms, more than 76% of the active acreage under exploration in India today have been awarded post 2014.

EPR Magazine (Electrical & Power Review)'den DAHA FAZLA HİKAYE

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

Wirepas certification a major step toward India's upcoming phase of AMI deployments

The Wirepas Certified programme is a major advancement for India's massive AMI deployments. This affirms device suitability for the diverse and challenging environments in the country. Teppo Hemiä, CEO of Wirepas discusses more with EPR.

time to read

2 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

BESS becoming the backbone of power capacity additions

India is undergoing a rapid clean energy revolution, aiming to deploy 500 GW of non-fossil capacity by 2030, of which it has already reached 250 GW.

time to read

6 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

Transformer industry undergoes evolution to meet capacity addition

The projected increase of over 433,000 MVA in substation capacity nationwide has served as a guiding force for the transformer sector. Amit Varshney shares his expertise in talks with EPR.

time to read

3 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

RenewSys elevates solar module reliability with advanced encapsulant technologies

To enhance the efficiency and reliability of its products, RenewSys has introduced advanced encapsulants and backsheets, including AA EVA (Anti-Acid) to combat internal corrosion, ENT POE to guarantee PID-free performance, and environmentally friendly options like the Green Backsheet.

time to read

2 mins

December 2025

EPR Magazine (Electrical & Power Review)

REC facilitates MoU between MePDCL and CPRI for quality testing in Meghalaya

REC Limited, a Maharatna Public Sector Enterprise under the Ministry of Power and a leading NBFC, has successfully mediated a crucial Memorandum of Understanding (MoU) between Meghalaya Power Distribution Corporation Limited (MePDCL) and the Central Power Research Institute (CPRI).

time to read

1 min

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

SECI, Andhra finalise 1200 MWh BESS and 50 MW hybrid project

Solar Energy Corporation of India Limited (SECI), a Navratna CPSU under the Ministry of New & Renewable Energy (MNRE), Government of India, has exchanged Government Orders (GOs) with the Government of Andhra Pradesh for the development of a 1200 MWh Battery Energy Storage System (BESS) at Nandyal and a 50 MW Hybrid Solar Project.

time to read

1 min

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

Convergence of digitalisation, automation, and electrification is the foundation of next-gen infra

Panasonic Life Solutions India is on a mission to contribute to reliable, sustainable electrification across various sectors in the country. Shahab Naqvi shares insights about the company's strategies in talks with EPR. Let us know more from him.

time to read

3 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

FY26 to attract $20-25 bn in renewable investments in India

The renewable energy sector in India has just hit a turning point. Between April and August 2025, the country added a record 20.1 gigawatts (GW) of renewable power capacity, a 123 per cent increase compared to the same period last year, when additions totalled just 9 GW. According to data from the Ministry of New and Renewable Energy (MNRE) and market observers like ICRA, this pace positions India to cross 35 GW of new capacity by the end of FY26, the highest annual addition in its clean-energy history.

time to read

3 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

Wirepas certification a major step toward India's upcoming phase of AMI deployments

This certification provides DISCOMs and AMISPs with confidence that a device has passed the toughest real-world tests for scalability, interoperability and reliability.

time to read

2 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

Renewable surge strains the grid as storage strengthens stability

The CEA mandates co-located ESS (approx. 2 hours) for new solar projects, aiming to reach 60 GW of storage by FY 2032 (including 42 GW of BESS and 19 GW of pumped hydro).

time to read

3 mins

December 2025

Listen

Translate

Share

-
+

Change font size

Holiday offer front
Holiday offer back