Gå ubegrenset med Magzter GOLD

Gå ubegrenset med Magzter GOLD

Få ubegrenset tilgang til over 9000 magasiner, aviser og premiumhistorier for bare

$149.99
 
$74.99/År
The Perfect Holiday Gift Gift Now

The industry needs incentives to overcome barriers to adopt new technologies

EPR Magazine (Electrical & Power Review)

|

July 2024

Yogesh Verma, Vice President & Business Unit Head, Switchgear, PEWIN, Panasonic Life Solutions India, shares insights on India's efforts to improve grid infrastructure with advanced switchgear technologies for renewable energy integration and climate change mitigation, focusing on government policies, manufacturer collaboration, and adoption strategies.

The industry needs incentives to overcome barriers to adopt new technologies

Yogesh Verma Vice President and Business Unit Head-Switchgear, PEWIN, Panasonic Life Solutions India

A key player in one of the largest manufacturers of à electrical construction materials (ECM), PEWIN, Panasonic Life Solutions India is dedicated to advancing green and clean energy initiatives in the country.

India is actively enhancing its grid infrastructure to integrate renewable energy sources and combat climate change. Significant investments are being made in smart grid technology, real-time monitoring, and advanced control systems. The government supports research and development in advanced switchgear technologies through substantial grants. Additionally, efforts are underway to train the workforce in maintaining and operating these advanced systems. The introduction of advanced switchgear and protection devices ensures optimal security and efficiency, safeguarding against overload, short circuits, and electrical leakage with high breaking capacity and user-friendly functionalities.

FLERE HISTORIER FRA EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

Wirepas certification a major step toward India's upcoming phase of AMI deployments

The Wirepas Certified programme is a major advancement for India's massive AMI deployments. This affirms device suitability for the diverse and challenging environments in the country. Teppo Hemiä, CEO of Wirepas discusses more with EPR.

time to read

2 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

BESS becoming the backbone of power capacity additions

India is undergoing a rapid clean energy revolution, aiming to deploy 500 GW of non-fossil capacity by 2030, of which it has already reached 250 GW.

time to read

6 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

Transformer industry undergoes evolution to meet capacity addition

The projected increase of over 433,000 MVA in substation capacity nationwide has served as a guiding force for the transformer sector. Amit Varshney shares his expertise in talks with EPR.

time to read

3 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

RenewSys elevates solar module reliability with advanced encapsulant technologies

To enhance the efficiency and reliability of its products, RenewSys has introduced advanced encapsulants and backsheets, including AA EVA (Anti-Acid) to combat internal corrosion, ENT POE to guarantee PID-free performance, and environmentally friendly options like the Green Backsheet.

time to read

2 mins

December 2025

EPR Magazine (Electrical & Power Review)

REC facilitates MoU between MePDCL and CPRI for quality testing in Meghalaya

REC Limited, a Maharatna Public Sector Enterprise under the Ministry of Power and a leading NBFC, has successfully mediated a crucial Memorandum of Understanding (MoU) between Meghalaya Power Distribution Corporation Limited (MePDCL) and the Central Power Research Institute (CPRI).

time to read

1 min

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

SECI, Andhra finalise 1200 MWh BESS and 50 MW hybrid project

Solar Energy Corporation of India Limited (SECI), a Navratna CPSU under the Ministry of New & Renewable Energy (MNRE), Government of India, has exchanged Government Orders (GOs) with the Government of Andhra Pradesh for the development of a 1200 MWh Battery Energy Storage System (BESS) at Nandyal and a 50 MW Hybrid Solar Project.

time to read

1 min

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

Convergence of digitalisation, automation, and electrification is the foundation of next-gen infra

Panasonic Life Solutions India is on a mission to contribute to reliable, sustainable electrification across various sectors in the country. Shahab Naqvi shares insights about the company's strategies in talks with EPR. Let us know more from him.

time to read

3 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

FY26 to attract $20-25 bn in renewable investments in India

The renewable energy sector in India has just hit a turning point. Between April and August 2025, the country added a record 20.1 gigawatts (GW) of renewable power capacity, a 123 per cent increase compared to the same period last year, when additions totalled just 9 GW. According to data from the Ministry of New and Renewable Energy (MNRE) and market observers like ICRA, this pace positions India to cross 35 GW of new capacity by the end of FY26, the highest annual addition in its clean-energy history.

time to read

3 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

Wirepas certification a major step toward India's upcoming phase of AMI deployments

This certification provides DISCOMs and AMISPs with confidence that a device has passed the toughest real-world tests for scalability, interoperability and reliability.

time to read

2 mins

December 2025

EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)

Renewable surge strains the grid as storage strengthens stability

The CEA mandates co-located ESS (approx. 2 hours) for new solar projects, aiming to reach 60 GW of storage by FY 2032 (including 42 GW of BESS and 19 GW of pumped hydro).

time to read

3 mins

December 2025

Listen

Translate

Share

-
+

Change font size

Holiday offer front
Holiday offer back