मैगज़्टर गोल्ड के साथ असीमित हो जाओ

मैगज़्टर गोल्ड के साथ असीमित हो जाओ

10,000 से अधिक पत्रिकाओं, समाचार पत्रों और प्रीमियम कहानियों तक असीमित पहुंच प्राप्त करें सिर्फ

$149.99
 
$74.99/वर्ष

कोशिश गोल्ड - मुक्त

Bangladesh's LPG Policy At A Crossroads

Energy & Power

|

EP_23_07 (Energy & Power Vol 23 Issue 7 September 16, 2025)

Bangladesh's reliance on liquefied petroleum gas (LPG) has grown rapidly in recent years as natural gas shortages intensify. Yet the policies guiding this sector remain fragmented and often misaligned with market realities. While the government is preparing a consolidated LPG policy to provide clarity, industry insiders stress that private operators, responsible for nearly 99% of supply, must play a central role in shaping it. From infrastructure gaps to safety lapses, the LPG industry faces mounting challenges that demand urgent policy attention and regulatory reforms.

- Mollah Amzad Hossain

Bangladesh's LPG Policy At A Crossroads

M. Muntasir Alam, Country Manager for MJL (S) PTE. Ltd, sheds light on the state of LPG policies, safety issues, and the way forward in an interview with Energy & Power Editor Mollah Amzad Hossain.

What is the status of LPG policies in Bangladesh, and how can they be improved?

The various policies related to LPG are now being combined into a comprehensive framework aimed at closing gaps and offering greater clarity. This effort is being led by government policymakers. However, it would be more effective if the private sector had greater involvement in drafting such a policy, since nearly 99% of Bangladesh's LPG supply comes from private licensees.

Developing infrastructure to import and distribute LPG to the last mile also requires joint efforts. Freight remains the most critical cost component in importing LPG. Ocean freight could be reduced significantly if imports were made in larger consignments, via VLGC carriers and refrigerated cargo, directly into importers' jetties. For this to happen, the river draft at Mongla and Chattogram must be increased. Similarly, improved expressways and larger highways would allow safer, faster LPG distribution through bulk tankers and trucks carrying packed cylinders.

Globally, the availability of onshore refrigerated LPG terminals, along with sufficient draft for VLGCs, is key to building a cost-effective LPG supply chain. Bangladesh is yet to build and commission such a terminal.

The country's annual LPG consumption is now about 1.8 million tonnes. But alongside this growth, accidents related to LPG are also increasing. Are operators fulfilling their responsibilities properly? What measures should be taken to prevent these accidents?

Energy & Power से और कहानियाँ

Energy & Power

Energy & Power

Fakir Technologies Launches 'ZERO' Energy Storage

Fakir Technologies Limited, a concern of the Fakir Fashion family, has officially launched Bangladesh's first multi-scale Battery Energy Storage System (BESS), marking a significant leap toward a smarter, cleaner, and more sustainable energy future.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

WEC Announces Chair for World Energy Congress 2026

With under one year until the 27th World Congress, World Energy the Energy Council is pleased to announce that Dr Naif Alabbadi has been elected to the Council's Board as the Chair for World Energy Congress 2026.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

EnDev Bangladesh Marks 16 Years of Advancing Energy Access

The Energising Development (EnDev) program, implemented by the Deutsche Gesellschaft fbr Internationale Zusammenarbeit (GIZ) GmbH, recently hosted a \"Knowledge Dissemination Workshop on EnDev's 16Year Journey\".

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

Rizwana Calls for Integrated Efforts to Restore Chalan Beel's Lost Glory

Adviser of the Ministry of Water Resources and the Environment, Ministry of Forest and Climate Change Syeda Rizwana Hasan has underscored the urgent need for integrated land and water management to protect the Chalan Beel, one of country's largest water bodies.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

UN Officials Visit Climate-Affected Communities in Khulna

Ahead of the upcoming Climate COP30, Conference UNDP Resident Representative Stefan Liller and UNDP Bangladesh's Goodwill Ambassador Jaya Ahsan visited Dacope, Khulna recently to witness firsthand how climate change is transforming lives Bangladesh's coastal regions.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

NGOs Warn 28 'Carbon Bomb' Projects Launched Since 2021

Some 28 so-called carbon bomb fossil fuel extraction projects have begun operating since 2021 despite their catastrophic climate impact, a group of NGOs warned recently.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

UN Says Refugees Stuck in Vicious Cycle of Conflict and Climate

The Emissions Gap Report that global 2025 finds warming projections over this century are 2.3-2.5°C, down from 2.6-2.8°C last year.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

Denmark Inaugurates Rare Low-Carbon Hydrogen Plant

Denmark inaugurated one of Europe's few low-carbon hydrogen plants recently, a sector touted as a key to cleaner energy but plagued with challenges.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

Massive Russian Attack Hits Ukraine Energy infrastructure: Kyiv

A massive Russian attack hit Ukraine's energy infrastructure, prompting power cuts in several regions, Kyiv's energy minister said recently.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

Exchange Rate Adjustment Pushes RNPP Cost Up by Tk13,386cr

The depreciation of taka against the US dollar has pushed the Rooppur Nuclear Power Project's cost up by Tk13,386 crore (11.84%), raising the total to Tk126,479 crore, the first revised proposal shows.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Listen

Translate

Share

-
+

Change font size