Passez à l'illimité avec Magzter GOLD

Passez à l'illimité avec Magzter GOLD

Obtenez un accès illimité à plus de 9 000 magazines, journaux et articles Premium pour seulement

$149.99
 
$74.99/Année

Essayer OR - Gratuit

COA, DPWH submit to Ombudsman evidence on P342.6-M 'anomalous' flood control projects

Manila Bulletin

|

September 9, 2025

The Commission on Audit (COA) and the Department of Public Works and Highways (DPWH) asked the Office of the Ombudsman (OMB) to investigate the administrative and criminal liabilities of three contractors and government officials in the P342.66 million “ghost and substandard” flood control projects in Bulacan.

- CZARINA NICOLE ONG KI

COA Chairperson Gamaliel Cordoba and DPWH Secretary Vince Dizon led the filing of five Fraud Audit Reports as evidence on five flood control projects implemented by the DPWH-Bulacan 1st District Engineering Office with Wawao Builders, St. Timothy Construction Corporation, and Syms Construction Trading.

The reports stated that Wawao Builders was responsible for flood-mitigation structures in Barangay Frances, Calumpit, Bulacan with a total cost of P77,199,999.65.

State auditors discovered that it was listed as "100-percent complete" but the contractor only finished 77.90 meters-falling short of the 124 meters stated in the original proposal.

The COA said that Wawao Builders was likewise paid an additional P3,130,041.22 without any documentation that would explain why the costs went up, which, the commission said, was contrary to the provisions of the Government Procurement Reform Act.

"During the inspection, shoddy workmanship issues were easily seen. Numerous cracks along the dike crest were observed, with an approximate total crack length of 3.9 meters and with crack width varying from 2 to 3.2 centimeters. Also, uneven concrete surfaces along the structure were evident," the COA said.

It said that another botched project from Wawao Builders is the construction of flood mitigation structures for P74,041,090.22 at Barangay Sta. Lucia. While the project was deemed "90-percent complete," auditors said they could not confirm this as the dike was tilting, misaligned, and "riddled with cracks".

PLUS D'HISTOIRES DE Manila Bulletin

Manila Bulletin

Manila Bulletin

16 DPWH personnel in Bulacan suspended over 'ghost' projects

The Office of the Ombudsman (OMB) has ordered the preventive suspension without pay of 16 Department of Public Works and Highways (DPWH) personnel in Bulacan First District Engineering Office over the P389.6 million “ghost” flood control projects in the province.

time to read

3 mins

September 20, 2025

Manila Bulletin

Manila Bulletin

PH business leader Oscar Hilado dies

Prominent businessman and Phinma Corp. Chairman Emeritus Oscar J. Hilado has passed away at the age of 87.

time to read

1 mins

September 20, 2025

Manila Bulletin

Manila Bulletin

BINI is first PH group to perform at Coachella

BINI continues to break into the international scene as they become the first Filipino group to perform at Coachella 2026.

time to read

1 min

September 20, 2025

Manila Bulletin

Offshore wind auction faces port challenge

As stakeholders prepare for the country’s first offshore wind (OSW) auction, attention is turning to the Philippines’ readiness for OSW development.

time to read

1 min

September 20, 2025

Manila Bulletin

'Ber' is here

Ten days left in September, with 31 to go in October and 30 in November for a total of 71 days before December comes merrymaking in.

time to read

1 mins

September 20, 2025

Manila Bulletin

Need to withdraw over P500,000 cash? Here's how to qualify

In a move to curb money laundering and other illegal financial activities, the Bangko Sentral ng Pilipinas (BSP) has issued new regulations that set a P500,000 cap on large-value cash transactions, including withdrawals and other payouts.

time to read

1 mins

September 20, 2025

Manila Bulletin

Manila Bulletin

Farmers receive land titles from PBBM

President Ferdinand R. Marcos Jr. has awarded agricultural and residential land titles to 455 farmer beneficiaries in Luzon.

time to read

1 mins

September 20, 2025

Manila Bulletin

'Nando' may make landfall as a super typhoon — PAGASA

The Philippine Atmospheric, Geophysical and Astronomical Services Administration (PAGASA) is not ruling out the possibility of Tropical Storm “Nando” (international name: Ragasa) intensifying into a super typhoon before it makes landfall in the country.

time to read

2 mins

September 20, 2025

Manila Bulletin

Over 1,000 classrooms turned over 'unfinished'

The Department of Education (DepEd) on Friday, Sept. 19, revealed that more than 1,000 classrooms nationwide had been turned over to schools in an \"unfinished\" state.

time to read

2 mins

September 20, 2025

Manila Bulletin

Police ensure security of independent probe panel

Recognizing the need to ensure the safety of the investigating panel, the Philippine National Police (PNP) announced on Friday, Sept. 19, that it is ready to deploy uniformed personnel to meet the immediate security needs of the Independent Commission for Infrastructure (ICI) as it begins probing reported anomalies in the flood control projects of the Department of Public Works and Highways (DPWH).

time to read

1 mins

September 20, 2025

Listen

Translate

Share

-
+

Change font size