Essayer OR - Gratuit
EDSA rehabilitation starts mid-June
Business World Philippines
|May 27, 2025
THE P8.7-billion rehabilitation of the Epifanio de los Santos Avenue (EDSA) is set to begin on June 13 and expected to be completed by 2027, the Department of Transportation (DoTr) said on Monday.
The DoTr outlined plans to address the traffic congestion that is expected to worsen once parts of Metro Manila's busiest highway will be closed for rehabilitation work.
"We will rebuild EDSA. This project by the Department of Public Works and Highways (DPWH) will rehabilitate the full stretch of EDSA and make it a green and walkable highway. We need to change the entire concrete structure of EDSA," Transportation Secretary Vivencio B. Dizon said at a media briefing on Monday.
The EDSA rebuild project, which will run for two years, will be the highway's first major rehabilitation since 1980. Around 437,000 vehicles use EDSA every day.
Public Works Secretary Manuel M. Bonoan said the project aims to make Metro Manila's longest and most congested highway a more pedestrian and commuter-friendly road.
Preparatory works will begin on the night of June 13, while construction will go full blast a week after, Mr. Bonoan said. This will include laying out the sections as the rehabilitation project is intended to be implemented lane by lane.
"The concept of the rebuild project, our deliverables are to rebuild and reconstruct the entire EDSA. We will change the pavement into a new one, in other words we will flip the entire EDSA and adapt the latest technologies on concrete mix," Mr. Bonoan said.
"We will deploy several contractors simultaneously. Construction will proceed lane by lane." Overall, a total of 200 kilometers of lane covering both northbound and southbound of EDSA will be rehabilitated, Mr. Bonoan said, adding that the south portion will be done first, followed by the northbound section next year.
"I do not think we can finish the southbound portion this year because it is already the middle of the year. We will continue the implementation of southbound and northbound until next year, simultaneously," Mr. Bonoan said.
Cette histoire est tirée de l'édition May 27, 2025 de Business World Philippines.
Abonnez-vous à Magzter GOLD pour accéder à des milliers d'histoires premium sélectionnées et à plus de 9 000 magazines et journaux.
Déjà abonné ? Se connecter
PLUS D'HISTOIRES DE Business World Philippines
Business World Philippines
Sun Life Grepa offers new insurance plan
SUN LIFE Grepa Financial, Inc. has launched a new life insurance product that allows customers to tap various investment funds.
1 min
December 19, 2025
Business World Philippines
Europe's naivety about the China export shock is tragic
EUROPEAN UNION (EU) carmakers like Volkswagen AG got their wish this week when a combustion-engine ban for 2035 onward was effectively abandoned.
2 mins
December 19, 2025
Business World Philippines
NBA expansion verdict due in 2026
A DECISION on possible NBA expansion is due next year, and Las Vegas and Seattle are at the head of the line should the league open the door to new franchises, commissioner Adam Silver acknowledged on Tuesday.
1 min
December 19, 2025
Business World Philippines
PHL may miss green shift gains sans nickel reform
THE Philippines risks missing out on the full economic and social gains from the global green transition if it continues to rely on raw nickel extraction without improving job quality, safety and domestic value creation, according to a research brief released this week by the International Labour Organization (ILO).
1 mins
December 19, 2025
Business World Philippines
Student-coach Robinson nets another UAAP crown for La Salle
DE LA SALLE University’s (DLSU) author to essaying another UAAP championship wasn’t just a mere coach.
3 mins
December 19, 2025
Business World Philippines
Pag-IBIG Fund, Megawide partnership to build over 7,000 socialized homes
Pag-IBIG Fund has entered into a partnership with Megawide Construction Corp. to accelerate the delivery of 7,143 housing units in medium-rise residential developments under the government's Expanded Pambansang Pabahay para sa Pilipino Program, or Expanded 4PH.
2 mins
December 19, 2025
Business World Philippines
DA calls boost to road funding ‘game-changing’
THE Department of Agriculture (DA) said the increase in the proposed allocation for farm-to-market roads (FMRs) to P33 billion for 2026 would be a “game-changing investment” in farm productivity.
1 mins
December 19, 2025
Business World Philippines
Trump highlights victories amid sinking approval ratings
In a rare evening address from the White House, US President Donald J. Trump boasted on Wednesday of his accomplishments and blamed his Democratic predecessor for soaring consumer prices as his party braces for a tough midterm election next year.
3 mins
December 19, 2025
Business World Philippines
Salmon Bank's new promo offers 8% time deposit rate
SALMON BANK (Rural Bank) Inc. announced the launch of its latest offering, “Bank on Eight,” a promotional interest rate of 8% per annum available to clients with Time Deposit placements of at least P1 million for a minimum of one year, starting from Dec. 1, 2025 to June 1, 2026.
1 min
December 19, 2025
Business World Philippines
Philodrill seeks new contract to continue petroleum operations in Palawan
UPSTREAM oil and gas firm The Philodrill Corp. is seeking a new government contract to continue and expand its petroleum operations in northwest Palawan following the expiration of its existing service contract.
1 mins
December 19, 2025
Listen
Translate
Change font size
