Essayer OR - Gratuit
Too Much Expected, Too Little Delivered
Energy & Power
|EP_23_09 (Energy & Power Vol 23 Issue 9 October 16, 2025 Anniversary Issue)
One of the major allegations against the previous regime, which ruled from 2009 to 2024, was widespread irregularities and corruption in the planning and management of the energy and power sectors. Many large-scale infrastructure projects were indeed built during that period.
Too much was expected from the interim government that took over state governance after the administration led by former Prime Minister Sheikh Hasina was ousted by a mass movement triggered by Gen Z. The movement of 2024 began as an apparently innocuous student protest against inequality but quickly grew into a nationwide uprising. Ordinary citizens joined the students, enduring clashes with law enforcement agencies. As the unrest intensified, leaders of the ruling party fled the country, and the government collapsed.
An interim government led by internationally reputed Nobel Laureate Dr. Muhammad Yunus assumed power, promising a free, fair, and participatory general election, along with essential reforms and neutral trials for those responsible for mass killings in July and August 2024. A year and a month have since passed, but both Bangladesh and the world have witnessed little meaningful change. Most conditions remain the same. No major reforms have been implemented, and questions are mounting about the fairness of ongoing trials. The interim government has announced that the general election will be held in the 2nd week of February 2026. With less than four months remaining, it is highly unlikely that any significant transformations will take place. Bangladesh now stands in a situation aptly described as “crackling clouds bringing little rain.”
This analysis does not aim to cover every sector. Its scope is limited to the energy and power sectors and their implications for sustainable economic development.
Cette histoire est tirée de l'édition EP_23_09 (Energy & Power Vol 23 Issue 9 October 16, 2025 Anniversary Issue) de Energy & Power.
Abonnez-vous à Magzter GOLD pour accéder à des milliers d'histoires premium sélectionnées et à plus de 9 000 magazines et journaux.
Déjà abonné ? Se connecter
PLUS D'HISTOIRES DE Energy & Power
Energy & Power
Govt Agencies Must Lead Transition to Renewable Energy: Rizwana
Environment, Forest and Climate Change Adviser Syeda Rizwana Hasan has said that all government agencies must transition to renewable energy within the next two to three years to set an example for the nation.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Carbon Markets Key to Bangladesh's Green Growth: Experts
Experts highlighted the potential of carbon markets to boost climate investments and promote sustainable growth in Bangladesh.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Vietnam, Singapore Step Up Cooperation on Energy, Trade, Technology
Vietnamese Minister of Industry and Trade Nguyễn Hồng Dikn and Singaporean Minister-in-Charge of Energy, and Science and Technology in the Ministry of Trade and Industry Tan See Leng have agreed to continue close coordination in implementing key areas of cooperation, particularly in energy, industry, trade, and science and technology.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Tk 1,200cr Lost in Missed Savings as Pipeline Sits Idle
Bangladesh has lost around Tk 1,200 crore in missed savings over the last one and a half years due to the delay in commercial launch of a dual pipeline that can carry imported oil directly from Cox's Bazar's Maheshkhali to Patenga in the port city.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
BD Seeks Korean Investments in Textiles, Electronics, Renewables
The Bangladesh Investment Development Authority (BIDA) has urged Korean investors to leverage Bangladesh's dynamic investment landscape, highlighting the country's strategic advantages and ongoing pro-business reforms aimed at facilitating foreign (FDI).
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
India Issues 3.6 GW of New RE Tenders
India has issued 3,600 megawatts (MW) of renewable energy tenders in September under the project development category.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Shipping Corporation Wants to Operate Pipeline
State-owned Bangladesh Shipping Corporation sent a proposal to the energy ministry through the shipping ministry on June 19, expressing its interest in operating the pipeline with assistance from a third party.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Climate Tipping Points Being Crossed, Scientists Warn
Global warming is crossing dangerous thresholds sooner than expected, with the world’s coral reefs now in an almost irreversible die-off, marking what scientists recently described as the first “tipping point” in climate-driven ecosystem collapse.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Energy Adviser Blames Section of Politicians, Businessmen for Crisis in Gas Sector
Adviser of the Ministry of Power, Energy and Mineral Resources Muhammad Fouzul Kabir Khan recently said a section of politicians and their allied businessmen have created the ongoing crisis in the gas sector.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Frequent Power Outages Leave Sunamganj Residents in Despair
Daily life in 12 upazilas of Sunamganj has been thrown into disarray as residents endure up to 18 hours of load-shedding each day due to an acute power shortage.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Listen
Translate
Change font size
