Passez à l'illimité avec Magzter GOLD

Passez à l'illimité avec Magzter GOLD

Obtenez un accès illimité à plus de 9 000 magazines, journaux et articles Premium pour seulement

$149.99
 
$74.99/Année

Essayer OR - Gratuit

Financing Bangladesh's Renewable Future: Escaping The Debt Trap And Building Energy Sovereignty By 2050

Energy & Power

|

EP_23_09 (Energy & Power Vol 23 Issue 9 October 16, 2025 Anniversary Issue)

Bangladesh is entering a defining decade.

- M. Zakir Hossain Khan

Financing Bangladesh's Renewable Future: Escaping The Debt Trap And Building Energy Sovereignty By 2050

The choices made today will determine whether the country leads its own clean energy transition or gets trapped in a spiral of debt while chasing climate goals set on someone else’s terms.

Emission forecasting should be based on electricity consumption (GWh), not just installed renewable capacity (MW), as actual emissions depend on the amount of energy generated and used. MW capacity reflects potential, but without accounting for utilization rates and demand-side consumption, the forecast risks underestimating or overstating emissions. That's why using GWh aligns projections with real energy use patterns, enabling more accurate links between renewable integration, fossil displacement, and emissions reduction.

  • The grid EF falls with stronger conditional uptake: 570 → 322 kg/MWh at Conditional in 2030, and to 69 kg/MWh at Ideal (Net Zero).

  • Reduction (2030) rises roughly monotonically with the different Scenario level: 5.4 Mt (10%) → 58.3 Mt (Conditional) → 100.3 Mt (Ideal).

  • Low-carbon share (RE + imports/nuclear) rises from 20% in BAU-2030 to 45.9% under Conditional to 85.9 under Ideal.

Our ambition is not in question. Bangladesh has made commitments under NDC 3.0: to reduce greenhouse gas emissions by 21.8% by 2030 and generate 20% of its electricity from renewable sources. We have the potential to install 24,106 MW of renewable energy plants, if funds are received under a conditional scenario. But the way these ambitions are financed will shape not only the future of our energy sector, but also our economic sovereignty.

A Price Tag That Demands Honesty

The government's official NDC 3.0 submission to the UNFCCC sets the cost of achieving its climate targets at USD 143 billion by 2030. Of this, only USD 34 billion is expected to be mobilized domestically; USD 109 billion would come from international partners, mostly through conditional finance.

PLUS D'HISTOIRES DE Energy & Power

Energy & Power

Energy & Power

Fakir Technologies Launches 'ZERO' Energy Storage

Fakir Technologies Limited, a concern of the Fakir Fashion family, has officially launched Bangladesh's first multi-scale Battery Energy Storage System (BESS), marking a significant leap toward a smarter, cleaner, and more sustainable energy future.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

WEC Announces Chair for World Energy Congress 2026

With under one year until the 27th World Congress, World Energy the Energy Council is pleased to announce that Dr Naif Alabbadi has been elected to the Council's Board as the Chair for World Energy Congress 2026.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

EnDev Bangladesh Marks 16 Years of Advancing Energy Access

The Energising Development (EnDev) program, implemented by the Deutsche Gesellschaft fbr Internationale Zusammenarbeit (GIZ) GmbH, recently hosted a \"Knowledge Dissemination Workshop on EnDev's 16Year Journey\".

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

Rizwana Calls for Integrated Efforts to Restore Chalan Beel's Lost Glory

Adviser of the Ministry of Water Resources and the Environment, Ministry of Forest and Climate Change Syeda Rizwana Hasan has underscored the urgent need for integrated land and water management to protect the Chalan Beel, one of country's largest water bodies.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

UN Officials Visit Climate-Affected Communities in Khulna

Ahead of the upcoming Climate COP30, Conference UNDP Resident Representative Stefan Liller and UNDP Bangladesh's Goodwill Ambassador Jaya Ahsan visited Dacope, Khulna recently to witness firsthand how climate change is transforming lives Bangladesh's coastal regions.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

NGOs Warn 28 'Carbon Bomb' Projects Launched Since 2021

Some 28 so-called carbon bomb fossil fuel extraction projects have begun operating since 2021 despite their catastrophic climate impact, a group of NGOs warned recently.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

UN Says Refugees Stuck in Vicious Cycle of Conflict and Climate

The Emissions Gap Report that global 2025 finds warming projections over this century are 2.3-2.5°C, down from 2.6-2.8°C last year.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

Denmark Inaugurates Rare Low-Carbon Hydrogen Plant

Denmark inaugurated one of Europe's few low-carbon hydrogen plants recently, a sector touted as a key to cleaner energy but plagued with challenges.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

Massive Russian Attack Hits Ukraine Energy infrastructure: Kyiv

A massive Russian attack hit Ukraine's energy infrastructure, prompting power cuts in several regions, Kyiv's energy minister said recently.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Energy & Power

Energy & Power

Exchange Rate Adjustment Pushes RNPP Cost Up by Tk13,386cr

The depreciation of taka against the US dollar has pushed the Rooppur Nuclear Power Project's cost up by Tk13,386 crore (11.84%), raising the total to Tk126,479 crore, the first revised proposal shows.

time to read

1 min

EP_23_11 (Energy & Power Vol 23 Issue 11 November 16, 2025)

Listen

Translate

Share

-
+

Change font size