Versuchen GOLD - Frei
The Indian grid is being stress-tested like never before
EPR Magazine (Electrical & Power Review)
|October 2025
To keep the lights on, utilities must digitise the "last mile" of the grid, including feeders, distribution transformers, and meters, and pair them with Al that can forecast, identify, and resolve problems before they escalate.
The Indian grid is being stress-tested like never before. Peaks near 190 GW in 2021 increased to 250 GW in May 2024, reaching 231 GW in May 2025 due to cooler weather, a reminder that demand volatility, not just growth, is the new planning constraint. Keeping the lights on depends on how quickly utilities digitise the “last mile” of the grid, including feeders, distribution transformers, and meters, and pair them with Al that can forecast, identify, and resolve problems before they cascade.
India has made significant investments in this direction. Under the Revamped Distribution Sector Scheme (RDSS), states have sanctioned more than 203 million (20.33 crore) smart meters, with 24.1 million (2.41 crore) installed as of mid-July 2025. Beyond consumer meters, RDSS also mandates smart metering of feeders and distribution transformers (DTs). These telemetry layers give utilities the high-frequency data that machine-learning models need to predict technical losses, detect tampering, localise outages, and automate restoration. Early rollouts are showing momentum from Nagaland to Gujarat, and the policy signal will be driven by data reliability and financial turnarounds.
Urgency at the transformer level
Diese Geschichte stammt aus der October 2025-Ausgabe von EPR Magazine (Electrical & Power Review).
Abonnieren Sie Magzter GOLD, um auf Tausende kuratierter Premium-Geschichten und über 9.000 Zeitschriften und Zeitungen zuzugreifen.
Sie sind bereits Abonnent? Anmelden
WEITERE GESCHICHTEN VON EPR Magazine (Electrical & Power Review)

EPR Magazine (Electrical & Power Review)
Sustainable pumping and grid balancing for a greener India
From IoT-enabled pump monitoring to pumps for thorium-based reactors and grid-balancing Pump As Turbine (PAT) systems, technologies are boosting efficiency, resilience and energy independence. This paves the way towards net-zero goals while reducing operational costs and environmental impact across sectors. Bhavesh Kansara from Kirloskar Brothers Limited speaks on the company’s initiatives in an exclusive interview with EPR.
5 mins
October 2025
EPR Magazine (Electrical & Power Review)
GST cuts open the door for renewable energy growth
The GST rate rationalisation to 5% will lower the cost of clean energy projects, making electricity more affordable and benefiting a broad spectrum of users.
2 mins
October 2025

EPR Magazine (Electrical & Power Review)
Compaq cable accessories are the backbone of reliable RE integration
Compaq International is setting up the COMPAQ Training Academy, which will offer structured certification programmes for 11 kV to 66 kV systems.
2 mins
October 2025

EPR Magazine (Electrical & Power Review)
With 10+ years of EPC leadership, SunGarner remains industry-trusted partner
SunGarner ensures reliable performance, long-term value and seamless energy transitions for its clients.
1 mins
October 2025

EPR Magazine (Electrical & Power Review)
Embedding Al for smarter and efficient operations
Forbes Marshall has collaborated with Largest Power generation company on Digital Wireless Vibration Analysis and Diagnostic Service systems and has installed demonstration units. The company's solutions help automate power plants, reducing cabling, manpower, and dependency on OEMs.
2 mins
October 2025

EPR Magazine (Electrical & Power Review)
MNRE introduces national policy to unlock India's geothermal energy potential
The Ministry of New and Renewable Energy (MNRE) has launched a national policy promoting geothermal energy, a renewable energy source that can help achieve India's net-zero goals.
1 min
October 2025
EPR Magazine (Electrical & Power Review)
Developers using electron beam tech to enhance durability in solar cables
Al-enabled cable monitoring is evolving from a cutting-edge solution to a mainstream standard, helping utilities optimise performance.
2 mins
October 2025

EPR Magazine (Electrical & Power Review)
Hydro power ensures grid stability with flexible generation capabilities
Power projects are now considered renewable energy projects since they do not generate GHG emissions during operation.
3 mins
October 2025

EPR Magazine (Electrical & Power Review)
Small and offshore wind driving rural power and RE growth
The ISTS waiver has been crucial in supporting wind energy projects by reducing power transmission costs and facilitating the delivery of power across states.
3 mins
October 2025
EPR Magazine (Electrical & Power Review)
The Indian grid is being stress-tested like never before
To keep the lights on, utilities must digitise the \"last mile\" of the grid, including feeders, distribution transformers, and meters, and pair them with Al that can forecast, identify, and resolve problems before they escalate.
3 mins
October 2025
Listen
Translate
Change font size