The Perfect Holiday Gift Gift Now

Interim Govt's Scorecard In Energy Sector

Energy & Power

|

EP_23_01 (Energy & Power Vol 23 Issue 03 June 16, 2025)

From August 2024 to mid-June 2025, ten months have whistled past. For a non-political, unelected regime inheriting a trouble-prone energy and power sector, it is not enough time to restructure, reorganize, and turn things around. But ten months is also not too little to expect formulation of policy changes, planning of reforms, and launching of programs for good governance, transparency, and accountability. Judging from the prevailing situation in Bangladesh's power and energy sector, the interim government could have introduced fundamental changes to bring the derailed sector back on track. Achieving sustainable energy security still appears to be a significant struggle.

- Saleque Sufi

Interim Govt's Scorecard In Energy Sector

The government has not changed much; the bureaucracy-dominated energy and power sector administration could neither improve governance, nor create incentives for employees, nor ensure transparency and accountability. The Integrated Energy and Power Master Plan (IEPMP) has not been updated. The government has made no decision on exploiting discovered coal reserves, nor has it expedited exploration of petroleum resources, both onshore and offshore. As a result, the sustainable supply of primary fuel for energy generation remains in crisis.

Although the government managed to provide funds to BPDB and Petrobangla to pay off outstanding dues, it failed to recover massive arrears from energy and power users. Domestic gas field production continues to deplete alarmingly, increasing reliance on imported LNG. A crisis could erupt if the LNG supply is disrupted during the high monsoon. However, power supply remains under control, mainly because demand hasn't reached the high levels seen last year. In brief, the situation is business as usual. The woes of end users remain unaddressed. People still cannot see any light at the end of the tunnel.

The government repealed the Quick Enhancement of Electricity and Energy Supply (Special Provisions) Act 2010, but simultaneously protected all existing contracts. It also reversed amendments to the BERC Act, which allowed the government to set tariffs and fuel prices. However, the tariff adjustments already made remain protected, effectively preventing BERC from conducting reviews. It is difficult to say if end users benefited at all from these two actions by the interim government.

WEITERE GESCHICHTEN VON Energy & Power

Energy & Power

Energy & Power

Belém's Hard Lesson

COP30 in Belem delivered mixed outcomes amid rising geopolitical tensions and record climate impacts.

time to read

7 mins

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

IDCOL Wins Asian Power Awards 2025

Infrastructure Development Company Limited (IDCOL) has been named \"Solar Power Project of the Year - Bangladesh\" winner at the Asian Power Awards 2025, which celebrated regional energy leaders at an awards dinner held on 23 October 2025 in Kuala Lumpur, Malaysia.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

DoE Shuts Illegal Brick Kilns, Fines TK 18 Lakh in Savar

The Department of Environment (DOE) recently a special conducted enforcement drive in Savar Upazila to curb air pollution and implement the degraded air shed declaration, shutting down several illegal brick kilns and realizing fines amounting to TK 18 lakh.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

Bangladesh Seeks Climate Justice at COP30

Bangladesh has emphasized justice, ambition and urgent global solidarity in the face of escalating climate impacts at COP30 in Brazil's Belйm.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

EU Moves to Bar 'Green' Labels for Fossil Fuel Investments

The European Commission said recently it wants to exclude companies involved in fossil fuels from financial products marketed as \"sustainable\" in the EU, a step long demanded by environmental groups and experts.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

IDCOL Requests Tk10b Support for Installation of 300 MW Green Power

Infrastructure Development Company Limited (IDCOL) has now turned its focus on promoting rooftop solar systems for both industries and public infrastructures.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

Loan-Heavy Climate Finance is Pushing Frontline Nations Toward a Debt Trap: New Analysis

Change Initiative recently disseminated the Climate Debt Risk Index 2025 (CDRI'25) jointly with Young Power in Social Action (YPSA), finding that loan-dominant climate finance, slow cash delivery, and high exposure to climate shocks are combining to raise debt risks across dozens of low-income and climate-vulnerable countries.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

ACC Raids Two Ctg BPDB Offices

The Anti-Corruption Commission has conducted raids on two offices of the Bangladesh Power Development Board in Chattogram region over allegations of irregularities.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

Third Cohort of Shoktikonna Graduates Held

The Shoktikonna Third Cohort Graduation Ceremony, held on 24 November 2025, celebrated a new generation of young women leaders committed to advancing Bangladesh's sustainable and inclusive energy future.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

DESCO Back in Profit in Q1 on Increased Distribution Margin

Company Dhaka Electric Supply (DESCO) secured a profit of Tk 583 million in the first quarter through September this year, marking a strong turnaround from a loss of Tk 322 million in the same quarter last year.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Listen

Translate

Share

-
+

Change font size