يحاول ذهب - حر
Transmission Line To Evacuate RNPP Electricity To Be Ready By Mid-May
EP_22_18 (Energy & Power Vol 22 Issue 17 March 1, 2025)
|Energy & Power
There has been no official fact-finding effort in determining the actual progress of the Rooppur Nuclear Power Plant project.
-
Dr. M. Rezwan Khan
One striking thing that affected the PGCB adversely is the undue interference of the ministry. It hampered the independent operation of the company. For the last 15 years, sitting secretaries of the ministry or the principal secretary became the chairman of PGCB, taking the opportunity to exert undue influence on the activities of the company, and on many occasions, the decisions went against the company's interest.
It is strange that there is no independent official progress report, i.e., how much progress has been made in different aspects of the power plant and how much work is left and when the plant will get ready to test-run the reactor. However, the issue of power evacuation only comes when the reactor is ready to operate, which I believe is not. Realistically, the transmission line should be ready by the end of March to mid-May 2025, as there are many uncertainties including delays in dollar disbursement from the Bangladesh Bank. As an independent person, I think, PGCB has given all possible efforts to complete the task on time.
Dr. M. Rezwan Khan, Professor Emeritus at the Department of EEE & Director of Institute for Advanced Research (IAR), United International University, made the observation about the project in an exclusive interview with Energy & Power Editor Mollah Amzad Hossain.
You are serving as the Chairman of the Board of Directors of the Power Grid Company Bangladesh (PGCB). How would you evaluate the progress of this public sector company?
هذه القصة من طبعة EP_22_18 (Energy & Power Vol 22 Issue 17 March 1, 2025) من Energy & Power.
اشترك في Magzter GOLD للوصول إلى آلاف القصص المتميزة المنسقة، وأكثر من 9000 مجلة وصحيفة.
هل أنت مشترك بالفعل؟ تسجيل الدخول
المزيد من القصص من Energy & Power
Energy & Power
Govt Agencies Must Lead Transition to Renewable Energy: Rizwana
Environment, Forest and Climate Change Adviser Syeda Rizwana Hasan has said that all government agencies must transition to renewable energy within the next two to three years to set an example for the nation.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Carbon Markets Key to Bangladesh's Green Growth: Experts
Experts highlighted the potential of carbon markets to boost climate investments and promote sustainable growth in Bangladesh.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Vietnam, Singapore Step Up Cooperation on Energy, Trade, Technology
Vietnamese Minister of Industry and Trade Nguyễn Hồng Dikn and Singaporean Minister-in-Charge of Energy, and Science and Technology in the Ministry of Trade and Industry Tan See Leng have agreed to continue close coordination in implementing key areas of cooperation, particularly in energy, industry, trade, and science and technology.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Tk 1,200cr Lost in Missed Savings as Pipeline Sits Idle
Bangladesh has lost around Tk 1,200 crore in missed savings over the last one and a half years due to the delay in commercial launch of a dual pipeline that can carry imported oil directly from Cox's Bazar's Maheshkhali to Patenga in the port city.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
BD Seeks Korean Investments in Textiles, Electronics, Renewables
The Bangladesh Investment Development Authority (BIDA) has urged Korean investors to leverage Bangladesh's dynamic investment landscape, highlighting the country's strategic advantages and ongoing pro-business reforms aimed at facilitating foreign (FDI).
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
India Issues 3.6 GW of New RE Tenders
India has issued 3,600 megawatts (MW) of renewable energy tenders in September under the project development category.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Shipping Corporation Wants to Operate Pipeline
State-owned Bangladesh Shipping Corporation sent a proposal to the energy ministry through the shipping ministry on June 19, expressing its interest in operating the pipeline with assistance from a third party.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Climate Tipping Points Being Crossed, Scientists Warn
Global warming is crossing dangerous thresholds sooner than expected, with the world’s coral reefs now in an almost irreversible die-off, marking what scientists recently described as the first “tipping point” in climate-driven ecosystem collapse.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Energy Adviser Blames Section of Politicians, Businessmen for Crisis in Gas Sector
Adviser of the Ministry of Power, Energy and Mineral Resources Muhammad Fouzul Kabir Khan recently said a section of politicians and their allied businessmen have created the ongoing crisis in the gas sector.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Energy & Power
Frequent Power Outages Leave Sunamganj Residents in Despair
Daily life in 12 upazilas of Sunamganj has been thrown into disarray as residents endure up to 18 hours of load-shedding each day due to an acute power shortage.
1 min
EP_23_10 (Energy & Power Vol 23 Issue 10- COP30 Special - November 1, 2025)
Listen
Translate
Change font size
