استمتع بـUnlimited مع Magzter GOLD

استمتع بـUnlimited مع Magzter GOLD

احصل على وصول غير محدود إلى أكثر من 9000 مجلة وصحيفة وقصة مميزة مقابل

$149.99
 
$74.99/سنة
The Perfect Holiday Gift Gift Now

System Loss Of Gas In Bangladesh

EP_23_09 (Energy & Power Vol 23 Issue 9 October 16, 2025 Anniversary Issue)

|

Energy & Power

Unpublished data for 11 months of the latest fiscal year (FY 2024-25) from Petrobangla reveal that the total system loss based on the difference between gas entering the national grid and gas sold to customers is 7.77%.

- Dr. Ijaz Hossain

System Loss Of Gas In Bangladesh

Of the many problems plaguing the energy sector, unaccounted-for gas (UFG) or system loss is certainly a significant one. It constitutes a direct financial loss at a time when the government has to provide subsidies, and does not have enough foreign currency to purchase LNG. System loss is an age-old problem in Bangladesh, as it is in many developing countries.

Unpublished data for 11 months of the latest fiscal year (FY 2024-25) from Petrobangla reveal that the total system loss based on the difference between gas entering the national grid and gas sold to customers is 7.77%. If this is the only loss, it wouldn't be too bad. The problem arises with the hidden loss in the domestic or residential sector. Since this sector is predominantly unmetered and consumers pay a flat fee according to the number of burners, the question that logically arises is: how is the amount of gas consumed by this sector determined? The gas shown as consumed is calculated using a hypothetical consumption per burner. The data from the gas consumption of metered customers indicate that this figure is an overestimation. Petrobangla, in their annual gas consumption data for FY 2023-24, has shown a gas consumption of 11% in this sector. Knowledgeable insiders strongly believe this cannot be more than 8%. Therefore, nearly 3% gas is unaccounted-for (UFG). This UFG is in addition to the 7.8% normally shown in annual reports. Thus, the actual gas loss exceeds 10%.

المزيد من القصص من Energy & Power

Energy & Power

Energy & Power

Belém's Hard Lesson

COP30 in Belem delivered mixed outcomes amid rising geopolitical tensions and record climate impacts.

time to read

7 mins

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

IDCOL Wins Asian Power Awards 2025

Infrastructure Development Company Limited (IDCOL) has been named \"Solar Power Project of the Year - Bangladesh\" winner at the Asian Power Awards 2025, which celebrated regional energy leaders at an awards dinner held on 23 October 2025 in Kuala Lumpur, Malaysia.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

DoE Shuts Illegal Brick Kilns, Fines TK 18 Lakh in Savar

The Department of Environment (DOE) recently a special conducted enforcement drive in Savar Upazila to curb air pollution and implement the degraded air shed declaration, shutting down several illegal brick kilns and realizing fines amounting to TK 18 lakh.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

Bangladesh Seeks Climate Justice at COP30

Bangladesh has emphasized justice, ambition and urgent global solidarity in the face of escalating climate impacts at COP30 in Brazil's Belйm.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

EU Moves to Bar 'Green' Labels for Fossil Fuel Investments

The European Commission said recently it wants to exclude companies involved in fossil fuels from financial products marketed as \"sustainable\" in the EU, a step long demanded by environmental groups and experts.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

IDCOL Requests Tk10b Support for Installation of 300 MW Green Power

Infrastructure Development Company Limited (IDCOL) has now turned its focus on promoting rooftop solar systems for both industries and public infrastructures.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

Loan-Heavy Climate Finance is Pushing Frontline Nations Toward a Debt Trap: New Analysis

Change Initiative recently disseminated the Climate Debt Risk Index 2025 (CDRI'25) jointly with Young Power in Social Action (YPSA), finding that loan-dominant climate finance, slow cash delivery, and high exposure to climate shocks are combining to raise debt risks across dozens of low-income and climate-vulnerable countries.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

ACC Raids Two Ctg BPDB Offices

The Anti-Corruption Commission has conducted raids on two offices of the Bangladesh Power Development Board in Chattogram region over allegations of irregularities.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

Third Cohort of Shoktikonna Graduates Held

The Shoktikonna Third Cohort Graduation Ceremony, held on 24 November 2025, celebrated a new generation of young women leaders committed to advancing Bangladesh's sustainable and inclusive energy future.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Energy & Power

Energy & Power

DESCO Back in Profit in Q1 on Increased Distribution Margin

Company Dhaka Electric Supply (DESCO) secured a profit of Tk 583 million in the first quarter through September this year, marking a strong turnaround from a loss of Tk 322 million in the same quarter last year.

time to read

1 min

EP_23_12 (Energy & Power Vol 22 Issue 12 December 1, 2025)

Listen

Translate

Share

-
+

Change font size

Holiday offer front
Holiday offer back