يحاول ذهب - حر
Early-2018 Return Assured For Australia's Iconic No. 3801
December 2017
|The Railway Magazine
Early-2018 Return Assured For Australia's Iconic No. 3801
TRANSPORT HeritageNSW, the body responsible for the care of Australia’s famous‘C38’Pacific No. 3801, has reaffirmed its commitment to ensuring the streamlined locomotive returns to action next year after an 11-year absence.
No. 3801 is often regarded as Australia’s answer to Flying Scotsman in fame terms and, like its UK counterpart, the course of the‘C38’s’overhaul has not been without its problems.
A number of technical issues were identified with the new-welded boiler, built in 2010 by Deutsche BahnMeiningen steam locomotive works, in Germany, which meant it did not comply with Australian standards.
هذه القصة من طبعة December 2017 من The Railway Magazine.
اشترك في Magzter GOLD للوصول إلى آلاف القصص المتميزة المنسقة، وأكثر من 9000 مجلة وصحيفة.
هل أنت مشترك بالفعل؟ تسجيل الدخول
المزيد من القصص من The Railway Magazine
The Railway Magazine
Ro-railers Ahead Of Their Time Or Overtaken By Events?
A new type of vehicle for use on both road and rail was trialled in the early 1930s, but never caught on. Alan Dale considers whether early road-rail vehicles were too advanced for their time.
8 mins
February 2018
The Railway Magazine
From Upminster To Upcycled: Vivarail's D-train
Ben Jones visits Long Marston to find out how redundant District Line trains are being rebuilt to provide cheaper and greener alternatives to brand new multiple units – and how Vivarail is looking to the future with new methods of propulsion.
7 mins
February 2018
The Railway Magazine
Fatal Fracture
In the fourth of our series looking back at major railway accidents, Fraser Pithie recalls what was a terrible accident in terms of loss of life – an event that took place 50 years ago, in 1967. Much was learnt from the tragic and profound events that arose from a fateful Bonfire Night at Hither Green, London on what was then British Rail’s Southern Region.
15 mins
November 2017
The Railway Magazine
ECML Power Supply Upgrade Complete
THE first phase of Network Rail’s programme to upgrade 25kV AC power supplies on the East Coast Main Line (ECML) is on track for completion in time for the introduction of new train fleets in 2018.
2 mins
November 2017
The Railway Magazine
Tyseley Launches £3million Share Offer For New TOC
FROM the moment Tyseley unveiled its newly overhauled flagship locomotive No. 7029 Clun Castle at the end of October, fans of the Collett 4-6-0 began to ask when the famous BR(W) ‘Castle’will double-head with sister No. 5043 Earl of Mount Edgcumbe on the main line.
4 mins
January 2018
The Railway Magazine
Bredgar's Little Gem
Gareth Evans visits the Bredgar & Wormshill Railway to discover the latest developments at the 2ft-gauge line in Kent, run by a group of friends, and open once a month to the public.
13 mins
January 2018
The Railway Magazine
South Yorkshire Tram-Train Project 400% Over Budget
South Yorkshire Tram-Train Project 400% Over Budget
2 mins
August 2017
The Railway Magazine
Rebirth Of The Corris Railway
In the latest instalment of our periodic Lazarus Lines features Cliff Thomas describes the resurrection the Corris Railway, previously owned by the GWR and Nationalised in 1948.
11 mins
August 2017
The Railway Magazine
Tornado Hits Cornwall
In a P&P extra, Keith Farr rides behind ‘A1’ No. 60163 Tornado on an epic journey from London to Cornwall – the first visit of the class to the Duchy.
9 mins
August 2017
The Railway Magazine
Steam & Heritage
Thousands at Mid-Hants for gala marking 50 years since Southern steam bowed out
3 mins
August 2017
Translate
Change font size
