استمتع بـUnlimited مع Magzter GOLD

استمتع بـUnlimited مع Magzter GOLD

احصل على وصول غير محدود إلى أكثر من 9000 مجلة وصحيفة وقصة مميزة مقابل

$149.99
 
$74.99/سنة
The Perfect Holiday Gift Gift Now

Packaging cool

September 2020

|

Racecar Engineering

Racecar looks at the design and engineering changes made to the 2020 Alfa Romeo F1 contender

- GEMMA HATTON

Packaging cool

For the second season running, one of the most interesting cars in the Formula 1 pitlane is not a Mercedes or a Ferrari, but an Alfa Romeo.

Cast your mind back to the beginning of the 2019 season, when the technical regulations encouraged simplified aerodynamic design, with wider front wings, standardised endplates and complex structures on front wings banned. Alfa Romeo’s C38 arrived at pre-season testing with the most extreme example of an ‘unloaded’ design, which quickly made it the talk of the town.

As a reminder, this is where the height of the front wing elements dramatically taper downwards from the nose to the endplates, reducing downforce but promoting outwash. This year’s C39 generated slightly less technical discussion at pre-season testing, but the concepts under the skin of the red and white car are just as radical.

The 2020 season is one of the anniversaries. Not only does it mark 70 years of Formula 1 itself, but also 50 years of Sauber Motorsport. During that time, the team has competed in 28 F1 seasons, the last two under the Alfa Romeo banner, a manufacturer which in turn is celebrating its 110th anniversary this year.

Throughout Sauber’s 486 F1 race career, the team has claimed 27 podiums and scored a total of 922 points. The Swiss outfit has also been successful in sportscar racing, winning the 24 hours of Le Mans in 1989 and securing the crown of overall sportscar champions two years running in 1989 and 1990.

Visible changes

المزيد من القصص من Racecar Engineering

Racecar Engineering

Racecar Engineering

Talk the torque

More thoughts on in-wheel motors and their effects on twisting force

time to read

6 mins

December 2021

Racecar Engineering

Racecar Engineering

Rolling about

An explanation of the limitations of a previous load transfer article, bringing jacking forces into the mix

time to read

5 mins

December 2021

Racecar Engineering

Racecar Engineering

F1 breaks schedule records

The FIA has confirmed no fewer than 23 races on the 2022 Formula 1 World Championship schedule, the highest number of grands prix ever to be held in a single season, and that has led to criticism from some teams that will be on the road for eight months.

time to read

1 mins

December 2021

Racecar Engineering

Racecar Engineering

Under pressure

Toyota may have finished first and second at Le Mans this year, but the effort required to overcome a fuel delivery problem and finish with both cars was Herculean

time to read

12 mins

December 2021

Racecar Engineering

Racecar Engineering

Physics at work

Dutch company, Intrax, offers Racecar Engineering an insight into the technologies it employs to optimise its suspension products

time to read

4 mins

December 2021

Racecar Engineering

Racecar Engineering

Williams' 2030 ambition

Williams Racing has committed to becoming climate positive by 2030 as part of an all-new sustainability strategy.

time to read

1 min

December 2021

Racecar Engineering

Racecar Engineering

Diff'rent strokes

Racecar looks at the different types of mechanical differential, their benefits and limitations

time to read

14 mins

December 2021

Racecar Engineering

Racecar Engineering

Das Boot

A curious Twitter exchange fired up a unique, hydrogen-powered, cross-country project that will contest the Baja 1000 in November 2022

time to read

8 mins

December 2021

Racecar Engineering

Racecar Engineering

Air born

Every racecar engineer's dream is a blank sheet of paper design. When Hoonigan and Subaru approached Vermont Sportscars about building the next generation of Gymkhana racer, that's just what the company was given

time to read

8 mins

December 2021

Racecar Engineering

Racecar Engineering

Remote control

Called variously ‘virtual garages’, ‘mission control’ or ‘race support rooms’ is the future of race engineering sitting in the warm back at HQ?

time to read

14 mins

December 2021

Translate

Share

-
+

Change font size

Holiday offer front
Holiday offer back